Wednesday, August 3, 2016

Aug 3, 2016- An Emirates plane has crash-landed at Dubai International Airport. All 300 people on board were able to escape from the burning aircraft, but a firefighter was killed.
The plane appeared to have landed on its belly, and images showed thick black smoke rising into the sky.
Emirates chairman Ahmed bin Saeed paid tribute to the firefighter who lost his life fighting the blaze.
The Boeing 777 was flying to Dubai from the southern Indian state of Kerala.
Flights to and from the airport were suspended for several hours but have now resumed.
The chairman told a press conference that evacuation procedures were executed professionally and the cabin crew were the last to leave the plane.
A passenger on board the plane told Reuters that the experience was terrifying.
"As we were landing there was smoke coming out in the cabin," said Sharon Maryam Sharji.
"People were screaming and we had a very hard landing.
"We left by going down the emergency slides and as we were leaving on the runway we could see the whole plane catch fire."
Emirates airline said there were 282 passengers and 18 crew on board from 20 nationalities, most of them Indian, with 24 Britons and 11 people from the United Arab Emirates.
 
As is usual following a big accident, there are lots of unconfirmed reports out there speculating about what happened.
The aircraft is sitting on the ground without its landing gear, but it is not clear why the wheels are not down.
Some reports suggest the crew were making a normal, rather than an emergency approach, when air traffic controllers told them to abandon the landing and start climbing again, for unknown reasons.
The answers should come out in the next few days.
Whatever the cause, it is a testament to the crew that they got everyone off the plane safely.
Flight EK521, direct from Thiruvananthapuram to Dubai, is popular with hundreds of thousands of Kerala residents who work in the Gulf countries.

Emirates is the Middle East's biggest airline, and has an excellent safety record.
It ranked seventh in a survey of the world's safest airlines by AirlineRatings.com, an independent plane safety website.
Dubai International Airport is a major transport hub, one of the world's busiest for international passengers, operating with only two runways.


Emirates plane crash-lands at Dubai airport

Aug 3, 2016- CPN (Maoist Center) Chairman Pushpa Kamal Dahal has been elected as the 39th prime minister of the country after securing the required majority in the Parliament.
This is Dahal’s second tenure to the country’s top executive post.  

Dahal secured 363 votes during the election for the post of PM held at Legislature-Parliament on Wednesday, while 210 votes were cast against him. 

​​House Speaker Onsari Gharti announced Dahal's victory after he secured a majority votes in the election conducted at the Legislature-Parliament. Dahal was the only candidate for the election.

He was supported by Nepali Congress, Sanghiya Gathabandhan, Madhesi Janadhikar Forum-Loktantrik, Rastriya Prajatantra Party and other fringe parties during the election.
Of the total 595 parliamentarians, 573 lawmakers participated in voting during the election.
Dahal’s first tenure as PM was followed by his party’s victory in the first Constituent Assembly election. The then CPN-Maoist became the largest party in the election and Dahal took office as the country’s 33rd prime minister on 18 August, 2008 after the country was declared republic.
His first tenure as PM lasted for 280 days. Following the controversial sacking of then Nepal Army Chief of Army Staff Rukmangad Katuwal, Dahal resigned from the post on 4 May, 2009.
Dahal has also become the only communist leader to become the PM of the country for two times.

Pushpa Kamal Dahal's Biography
 
Born    December 11, 1954
1978    Starts politics with the CPN (Fourth Convention)
1985    Elected central member of CPN (Masal)
1986    Party splits, Dahal sides with Mohan Baidya-led party
1980    Becomes party’s general secretary after Baidya resigns following a fiasco popularly known as “sector incident”
1992    Becomes general secy of CPN (Unity Centre)
1995    General secy of CPN (Maoist) 
2001    Becomes chairman of the CPN (Maoist)
1996    Leads a decade-long armed rebellion which ended in 2006 leaving around 16,000 dead, thousand others disappeared and displaced and disabled
June 16,’06    Appears overground in Baluwatar
Aug 18,’08    Becomes first prime minister of republic Nepal
May 25,’09    Steps down following a row over sacking of then Army chief
Nov ’13    His party faces major setback in second CA elections, gets lapsed into third position
Aug 3,’16    Elected 39th prime minister; become first communist to return to power twice





Dahal elected 39th prime minister of Nepal

Monday, August 1, 2016

Aug 2, 2016- A British court on Monday acquitted Nepal Army Colonel Kumar Lama on one count, while the jury failed to arrive at consensus on the second count.
Col Lama, arrested in January 2013, has been on trial at the Old Bailey, for torturing two alleged Maoist rebels—Karam Hussein and Janak Raut—in 2005 when he was in-charge of the Gorusinghe barracks in Kapilvastu district. Lama has all along denied both counts of inflicting severe pain or suffering. The Old Bailey on Monday acquitted Lama on the case of Karam Hussein. Hearing on Janak Raut’s case has been postponed until first week of September.
A 12-member jury is supposed to reach a unanimous decision.
Lt Col Lama was serving with the United Nations peace keeping force in South Sudan when he was arrested while visiting his family in East Sussex in January 2013.
He was arrested under Section 134 (sub-section 1) of the Criminal Justice Act, a law that defines torture as a universal jurisdiction, and the prosecution is being brought in Britain because an obligation under the United Nations Convention Against Torture to bring suspects to justice wherever they are detained. Torture, like war crimes, is subject to universal jurisdiction, allowing those who allegedly committed crimes abroad to be tried in Britain.
Hussein and Raut were arrested during the decade-long Maoist insurgency on suspicion of assisting then Maoist rebels. Lama faces charges of subjecting the two victims to mistreatment during their detention at the barracks of which he was the in charge in 2005.
Lama’s case has been dragging on for the last three years, with on one occasion in March last year the court adjourning the trial for the lack of a qualified interpreter for the Old Bailey hearing.
After Lama’s acquittal on one count on Monday, advocate Satish Raj Mainali said, “It raises questions about the credibility of Nepal’s human rights organisations when it comes to documenting incidents of rights violation. It also shows that issue of universal jurisdiction is not a cake walk.”
Govinda Bandi, another rights lawyer, though expressed happiness over Lama’s acquittal, argued that the case has established the fact that universal jurisdiction can be invoked to seek justice even in foreign land.
“It is not a matter of winning or losing the case,” Bandi said. “The lesson from this case is Nepal must strengthen its own system so that no Nepali national is tried on foreign soil.”





UK court acquits Col Lama on one count of torture

Aug 2, 2016- The Parliament Secretariat on Monday published the time table for the election of a new prime minister, which will be held on Wednesday.
As per the notice of the Parliament Secretariat, nominations can be filed between 11am and 4pm on Tuesday and a list of the nominations will be published at 4:30pm on Tuesday.
As per Article 298 (3) of the Constitution of Nepal, any member of the Legislature-Parliament can file his/ her candidacy for the post of the prime minister. Parliament then on Wednesday will start the process to elect the new prime minister at 11am.
Manohar Prasad Bhattarai, general secretary of the Parliament Secretariat, published the notice for the election of the prime minister on Monday following instructions from Speaker Onsari Gharti to make all the necessary preparations for the same.
The three-day process to elect a prime minister through election began on Monday after the seven-day deadline set by President Bidhya Devi Bhandari to form consensus government ended on Sunday.
The presidential call to elect consensus prime minister had followed Prime Minister KP Sharma Oli’s resignation on July 24 after his government was left without a majority in the wake of CPN (Maoist Centre)’s July 12 decision to withdraw support.
The Maoist Centre and the Nepali Congress had filed a no-confidence motion against PM Oli, but the latter announced his resignation on July 24, minutes ahead of the scheduled voting on the motion, which he was certain to lose.
The Office of the President earlier on Monday had sent a letter to Parliament, calling it to start the process to elect a new prime minister.
Dahal likely to face Nembang
KATHMANDU: CPN (Maoist Centre) Chairman Pushpa Kamal Dahal looks all set to win the election  on Wednesday to become the next prime minister. In the 595-member Parliament, he will require 298 votes to win the prime ministerial election that will start at 11am on Wednesday. The Maoist Centre, the third largest party with 82 seats in Parliament, has the backing of the Nepali Congress, the largest party with 207 seats. The Maoist-NC alliance is most likely to get the support of the Madhes-based parties and other fringe forces to elect Dahal the new PM. A rough calculation shows there are around 366 votes in favour of Dahal. Meanwhile, the CPN-UML is likely to field its Deputy Parliamentary Party leader Subas Nembang against Dahal. Speaking at a programme in the Capital on Monday, UML leader Rabindra Adhikari claimed that the party would naturally field their deputy PP leader.







Parliament set to vote to elect new PM tomorrow

Sunday, July 31, 2016

Jul 31, 2016- Sadbhawana Party Chairman Rajendra Mahato has remarked that no infrastructure should be built at no-man’s land along Nepal-India border without the agreement between the two countries.
Mahato said so during his visit to Nepal-India border at Tilathi in Saptarai district where Nepalis and Indians clashed on Thursday after the latter built a makeshift levee allegedly encroaching upon the Dasgaja region. The Sadbawana Party chairman, who was accompanied by a dozen central members of his party including senior vice chairmen Mirgendra Singh Yadav and Nawal Kishor Sah, blamed irresponsibility on the part of Nepal government for the clash.
“The government is engrossed in the worry of losing the chair, while the people are fighting to defend the border,” said leader Mahato. He went on to say that problems at Nepal-India border have been increasing due to the state’s failure to resolve the controversy over dam construction through diplomatic efforts and timely initiatives.
 “The clash at Tilathi is the result of government’s lack of accountability. The government is bent on ruining the 'Roti-Beti' relationship between Nepal and India and stir a fight between the people of two countries. The government’s lack of responsibility has caused a situation where maternal uncle and nephew are fighting,” said leader Mahato. He further charged that the government is afflicted by bad feelings towards Madhes.   
Twelve people were injured in a clash on Thursday after the Nepali side removed the makeshift levee built by Indian side on Wednesday. Locals had claimed that the structure could cause inundation in the Nepali territory.
People on the Indian side started making the levee on Wednesday after a dam was destroyed by the rain-swollen Khado stream.
In a different context, leader Mahato said that his party had already made up its mind to vote against the KP Oli-led government though Nepali Congress and CPN (Maoist Centre) had not asked for support to topple the government.
“We always wanted to topple KP Oli government that showed towards India’s Utter Pradesh when we demanded separate Madhes state,” said Mahato, “That’s why we supported the alliance that stood against the government.”
He made it clear that his party would not join Nepali Congress (NC)-Maoist coalition government. He arrived here to distribute relief to the flood victims on behalf of the party. He visited the flood affected VDCs in southern part of the district. 




Sadbhawana Chair Mahato blames govt for clash at no-man’s land

Saturday, July 30, 2016

Jul 30, 2016- China’s support to a new government in Nepal will continue, Chinese Ambassador Wu Chuntai said on Friday, adding that Beijing would fully assist Nepal in its development endeavours.
During a meeting between Wu and CPN (Maoist Centre) Chairman Pushpa Kamal Dahal, the Chinese envoy told the latter that Beijing will extend all possible cooperation for a stable, prosperous and stable Nepal, a statement issued by Dahal’s secretariat said on Friday.
During the meeting, Dahal, the prime minister-in-waiting, told the Chinese envoy that the pacts and agreements signed by Prime Minister KP Sharma Oli with China would be implemented even after government change.
Apprising the Chinese envoy of recent political development, Dahal told Wu that he would look forward to cooperation from the northern neighbour during his tenure as prime minister.
Congratulating Dahal, the Wu said that the Chinese government, the Chinese people and the Chinese Communist party would work closely with the new government in Nepal, added the statement. 
Dahal told the Chinese envoy that agreements and deals signed by the Oli government with Beijing in March were a result of his continued efforts for the same.
In an interview to the Post on Thursday also Dahal had said the new government under his leadership would implement the pacts and agreements signed by the Oli government. “The new government under my leadership will focus on implementation of the new constitution, restoring political stability and peace and expediting post-quake,” the statement quoted Dahal as telling Wu.


Wu says China’s support to Nepal will continue

Jul 30, 2016- Ncell has submitted a new proposal to the Department of Industry (DOI), seeking the latter’s approval to capitalise its investments worth Rs73.95 billion. The company has so far got approval to take its authorised capital to Rs17 billion.
Earlier, the Industrial Promotion Board (IPB) had rejected the company’s proposal to increase its authorised capital to Rs155.33 billion on the ground that it had not paid applicable capital gains tax for the divestment of 80 percent stake of Ncell to Malaysian company Axiata by Swedish-Finnish telecom operator TeliaSonera. The IPB has formed a taskforce to study the matter.
The Parliamentary Finance Committee has also directed the government not to accept Ncell’s proposal until it pays the capital gains tax. Ncell has paid 15 out of 25 percent of the applicable capital gains tax.
Industry Secretary Surya Silwal told the Parliamentary Finance Committee meeting on Friday that Ncell had sought approval to convert its investment into authorised capital. The telecom operator has already increased its cap- acity and capital internally.
Silwal and other IPB members present at Friday’s meeting seemed positive on Ncell’s latest proposal. They explained Ncell’s proposal was not a capital increment plan, but a request for approval of what it had already invested. “This is not capital increment,” said Silwal. “The telecom operator is seeking approval for its investment made till date from its earnings.”
A DoI source said since the Finance Committee has directed the government not to accept Ncell’s proposal before the capital gains tax is cleared, “the company and the government authorities came out with new plan”. “In whatever name it comes, it is capital increment.”
The board is planning to approve Ncell’s proposal after charging fine worth Rs500,000, the source added. “Since Ncell has increased its capital without getting DoI’s approval, as per the Industrial Enterprises Act,  the company is subjected to be fined Rs500,000,” said the DoI source.


Ncell seeks nod to capitalise its investments

Friday, July 29, 2016

Jul 30, 2016- The second edition of Management Education Expo 2016 kicked off in the Capital on Friday.
Chief Secretary Somlal Subedi inaugurated the two-day event, organised by Pathshala Education Foundation, in which colleges affiliated with Tribhuvan University, Kathmandu University, Purbanchal University and Pokhara University are participating.   
The expo, being organised at Hotel Annapurna, Durbarmarg, focuses on bachelor’s and master’s programmers and aims to stem the trend of Nepali students going abroad for business studies, according to Sanjay Mandal, chairman of the Pathshala Education Foundation.
According to the organisers, more than 40 colleges from different national universities are participating in the event.
“They are participating in the expo with the message that Nepali colleges are capable of providing better education focusing on BBA, MBA and other management faculties,” the organisers said, adding that they are expecting around 10,000 visitors.


Management Edu Expo begins

Jul 30, 2016- Supreme Court justice nominee Sapana Pradhan Malla has said that Nepal should find a lasting solution to the pending issues of transitional justice by setting up legal and institutional systems to give a closure to the conflict-era cases.
Responding to the queries of members of the Parliamentary Hearing Special Committee, Malla, who is also an elected member of the Convention Against Torture, argued that it was imperative for the country to address the issue as it is the only way to avoid possible application of international jurisdiction on conflict-era cases.
Since the transitional justice bodies are in place, there should not be any problem in redressing the wounds of the conflict victims,” said Malla. “Transitional justice is also about rebuilding social fabric through legal and non-legal recourse.”
Arguing that transitional justice is a component of the peace process, she said that the government and the political parties should act responsibly to deliver justice to the conflict victims.
“At the same time, Nepal should also ensure non-repetition of rights violation in the future in addressing the conflict-era cases,” she said.
The government formed the Truth and Reconciliation Commission and the Commission of Investigation on Enforced Disappeared Persons to look into conflict-era cases in February last year. The commissions have already collected over 55,000 complaints related to conflict-era cases. Currently, they have been screening the complaints while also registering cases from their central offices in Kathmandu.
Malla, who described herself as a “cause lawyer” due to her dedication to advocacy for social justice, emphasised the need for a vision to make justice accessible and affordable to all. Committee members appreciated her passion for social cause as well as her credentials. They openly admired her accomplishments as a lawyer and educator, who completed secondary school in her home district Nawalparasi and made it to Harvard Law School as a guest lecturer. She has won cases against discriminatory laws against women.
Almost all the committee members who spoke commended her past works instead of asking questions. One of the members, Ayandra Bantawa, even congratulated her on her new responsibility.
Nepali Congress leader Chitra Lekha Yadav wanted Malla to be a “cause judge” as well, while another member Sarita Kumari Pariyar expressed hope that she would address the way rape victims are grilled in the court.
NC leader Prakash Sharan Mahat and a few other members asked Malla if she would leave behind her past, who remained a Constituent Assembly member. “I believe in transformative responsibility,” she said. “I was nominated a CA member in my capacity as an expert, not as a party member.” No lawmaker present in the committee questioned her about her political affiliation. They instead argued that she was a deserving candidate for the role.
“We have seen you speak against party decisions during the constitution writing process,” said NC leader Bal Krishna Khand. “But we raised the issue of your political background to debate the kind of system we want, which you should not mind at all.” The committee also heard SC Justice nominees Ishwar Prasad Khatiwada, Ananda Mohan Bhattarai, Anil Kumar Sinha and Prakashman Singh Raut. The next meeting is scheduled for Sunday.
Low implementation of court orders
DEWAN RAI
The government has been ignoring more than 55 percent of the rulings on conflict-era cases issued by the Supreme Court and Appellate Courts.
A study conducted by the National Judicial Academy shows that the government has implemented only half of the court verdicts on cases related to war crimes, that too orders to provide compensation for the victims.
The report on the Implementation Status of the Court Decisions on Transitional Justice, released on Thursday, shows that only 21 percent cases were fully implemented while 24 percent cases related to insurgency were partially implemented.
Of the 29 sampled verdicts, 19 decisions of the SC and eight rulings of the Appellate Court were
issued on conflict-era incidents since the insurgency period. Of them, six verdicts were implemented, seven partially enforced while 16 orders were never implemented.
According to the report, victims, during focus group discussions, cited political influence as the major reason for low implementation rate of the verdicts, while lack of legal infrastructure and institutional apathy are also blamed.
Nepal has not criminalised the acts of torture and disappearance. After the arrest of Nepal Army Col Kumar Lama in the United Kingdom under universal jurisdiction, Nepal prepared a bill two years ago to criminalise torture. However, it was never tabled in Parliament.
As the government delayed the drafting of a bill to criminalise disappearance, the Commission of Investigation on Enforced Disappeared Persons presented it to the government last year. The government has not tabled both the bills for discussion.




Nepal should address transitional justice issues on its own: Sapana Pradhan Malla

Thursday, July 28, 2016

Jul 28, 2016- Preparations have been complete for the 9th Nepal Festival to be held in Japan on August 6 and 7 on the occasion of 60th years of bilateral relations between Nepal and Japan, the main organising committee said. 
To be organised by the Non Resident Nepali Association (NRNA), Japan with the financial support of the Ministry of Foreign Affairs of Nepal and the Nepali embassy in Japan, the festival aims at promoting tourism, said Sudhan Thapa, coordinator of the committee and the NRNA, Japan chairman. 
Around 40 stalls will be set up displaying various goods and dishes representing Nepali art and culture, Thapa said. Information about tourism destinations of Nepal will also be disseminated, he added. 
Famous Nepali and Japanese artists will also show musical performance at the event, said Devi Lal Bhandari, NRNA Vice Chairman and deputy coordinator of the committee. 
As many as 45,000 visitors are expected. RSS



Preparations complete for 9th Nepal Festival in Japan

Jul 28, 2016- India has said that recent political changes in Nepal including Prime Minister KP Oli’s resignation are internal matters of Nepal.
Amid Indian reports that India is happy with the Oli’s resignation, Official Spokesperson of Ministry of External Affairs Vikas Swarup said India is neither happy nor sad with the recent political development in Nepal.
He said it is the government’s responsibility to work with the political leadership of all countries. This is the first official reaction of Indian government since the Oli resigned as PM this week.
“As far as the recent political development in Nepal is concerned, we treat them as a sole internal matter of Nepal and I do not want to make any comments,” Swarup said in a weekly regular press briefing. China on Tuesday also provided a similar comment stating that it is internal matter of Nepal.
Citing high level government officials, Indian media, this week, reported that India was happy with the collapse of CPN-UML Chairman Oli-led government. It was also reported that India has backed the NC-Maoist coalition which is in the process of forming government.
A senior government official, however, told the Post that it is not true that India is happy with collapse of government. “We are closely watching the unfolding of Nepali political development. It is not true that India entirely believes that new coalition will address all the outstanding issues,” said the official.
Earlier, India’s Ministry of External Affairs Sushma Swaraj, in a meeting with a Parliamentary Delegation from Nepal, had said that despite the repeated assurances Prime Minister KP Oli and Deputy Prime Minister and Minister for Foreign Affairs Kamal Thapa did not address issues related to federal demarcation. 

Recent political developments Nepal's internal matter: India

Wednesday, July 27, 2016

Jul 28, 2016- The devastating earthquake in April 2015 left 533,045 families homeless. Since the disaster, there have been two successive coalition governments, and now a third one is about to take over following Prime Minister Oli’s resignation. However, the homeless families are still without their newly constructed houses as they face the second monsoon and landslides even though the international community had pledged $4.4 billion in June 2015. The US and India have even promised additional funding. Contrarily, the government and major political parties are continually going off on a tangent with their insatiable and unethical political games and egotism to grab power, forgetting national dignity and how urgently the post-quake rehabilitation and reconstruction programme should be implemented.

Considering a history of dismal progress in implementing national infrastructure projects and underperformance in conducting programmes under the budget, it is speculated that successive governments, bureaucrats, planners and technocrats do not have the required capacity to carry out rehabilitation and reconstruction projects. This assumption is further reinforced by the fact that large quantities of supplies are still languishing in warehouses at Kathmandu airport due to managerial ineptitude to even distribute them to quake victims. Tonnes of supplies have already been destroyed. It is illogical that the government has been preparing to sell the rice donated as aid for quake victims instead of distributing it to them. 

Poor performance
Further, it took the government nearly six months after the earthquake to form a National Reconstruction Authority and name a CEO in September 2015. The CEO had barely taken office when another head was appointed in December 2015 after the CPN-UML came to power, pointing to political obduracy and ineptness. Besides building houses for the homeless, the government is yet to start work on reconstructing the iconic Dharahara Tower and Kasthamandap, which is of immense historical and cultural importance. The families living under tarpaulins are least concerned about the on-going political debate on the number of instalments of relief funds distributed. They urgently need prefab houses or a few bundles of corrugated metal sheets, wood or metal poles and beams, doors and windows and a few bags of cement along with technical supervision and subsidised skilled labour. Providing food for work to enable families to contribute unskilled labour during the construction period would also be a truly humanitarian act.

International donors have been criticised for the conditions that accompany their aid. They include donor-driven priority funding, cumbersome processes, very high accountability standards and rigidity. However, aid recipients often forget that donors also have to answer to their prime sources of contributions. Insistent behaviour and the absence of engagement on either side could only delay the whole process. Politically motivated renegotiations to alter any grant agreement conditions such as lowering the number of tranches from three to two, as happened after a weeklong obstruction of the House by the opposition Nepali Congress to pressurise the coalition government, may only weaken credibility and cause inordinate delays in completing project activities. 

The government has not been convincing in mobilising additional resources to close the substantial funding gap in line with the grant agreement documents. Likewise, it is uncertain how efficiently and effectively the government is prepared to deliver payments in several tranches to all the eligible quake victims so that they can rebuild their homes without delay. Apparently, cost overruns and reported external interference leading to political instability in Nepal, if true, are another factor slowing down the rehabilitation and reconstruction mission. 
Leading to a fiasco
The homeless families in the 14 districts hardest hit by the quake, which include Gorkha, Sindhupalchok, Dhading and Dolakha, should not have to suffer any more due to political debates and inaction besides passiveness and rigidity of the international donor community. Recurring delays caused by the tendency to ‘put the cart before the horse’ and lack of sincerity is absolutely unaccountable and unacceptable. This could damage the dignity of the homeless families including children, women and the elderly. Many homeless children are also at high risk of human trafficking.

The current situation reminds us of the bitter experience of more than 100,000 Bhutanese refugees of Nepali origin fighting for democracy who were left to languish in camps for almost two decades. Nepal and the international community including the UN could neither repatriate them with dignity nor rehabilitate them in Nepal by providing them shelter and livelihood opportunities despite their keen interest to return and live in their own homes. Surprisingly, they were provided asylum by countries such as the US, Canada and Australia. 

Next, as a preliminary step to aid the government of Nepal, the US initially granted Temporary Protected Status (TPS) to earthquake victims in the name of family reunion. Therefore, trying to manage the earthquake reconstruction and housing construction for homeless families by politicising it for petty political gain and inexcusably delaying it without any sincere hard work and tangible results in time may eventually end in a myth or fiasco. It may take a different turn altogether at the cost of national dignity. The post-quake rehabilitation and reconstruction programme should be conducted intellectually, ethically, unremittingly and with spiritual instinct by the government and all political party leaders in unison and with solidarity.

\


Plain inefficiency

Jul 28, 2016- Death toll from flooding and landslides across the country continued to rise on Wednesday, as government authorities scrambled to put in place a disaster management system. 

At least 77 people have been reported dead in floods and landslides since Monday. Nine persons are still missing. However, the Ministry of Home Affairs has put the death toll from the water-induced disasters at 57. 

With monsoon in full swing, torrential rains in many parts of the country have caused floods and landslides, putting thousands of lives at risk. 

Pyuthan district has been hit the hardest. Death toll from separate incidents of flooding and landslide in the mid-western district on Wednesday rose to 36. CPN (Maoist Centre) central member Hari Bahadur KC was among the dead. Six others are still missing. At least six VDCs in the district have been hugely affected. Inspector Nir Bohara, who was leading a relief and rescue operation, said at least 24 people were killed in Phopli alone. 

“The rescuers plucked the bodies from the debris and handed them over to their families,” he added. The bereaved families, however, have not been able to perform the final rites, as the authorities are yet to carry out post-mortem. Doctors have not reached the area yet. Around 200 families have been displaced due to floods and landslides. 

In Baglung, two more bodies were recovered on Wednesday. With this, the death toll in the district has reached six. Floods have also swept away four micro-hydropower projects and damaged some bridges, according to police.   

Our local correspondent from Rolpa reported that four members of a family were buried to death in a landslide at Uwa VDC-9. 

In Jhapa, three persons were swept away by the rain-swollen Geuriya stream. Two persons from Topgachhi and one from Garamani died in the incident, said police. Three other people are still missing in flooding in the district. 
In Dang, a missing person from Gangaparaspur-9 was found dead on the bank of Rapti River on Wednesday. Similarly, three persons were killed in Arghakhanchi, while one each died in Parbat and Kapilvastu in floods and landslides.
600 rescued in Banke
BANKE: Over 600 flood victims who were stranded since Monday night due to flooding in Rapti river in Chaupheri village in Banke were rescued on Wednesday. A Nepal Army chopper rescued them to safer locations in Holiya VDC. Maharaja Ahir of Chaupheri, one of the rescued, said his village has been completely submerged. According to police, hundreds of people from Devpura, Piprahawa, Shantipur, Bhawaniyapur, Gedawa and Bharta among other villages in the districts have been displaced by flooding. 
Water levels rising in Narayani, receding in Koshi 
CHITWAN: Water levels in Narayani River crossed the danger mark on Wednesday. Residents living in the surrounding areas have moved to higher grounds. All the floodgates of the Gandak Barrage in Triveni have been opened. Police said 34 houses have been inundated in Susta, Triveni. Nepal Army personnel have been mobilised in the flood-affected areas. However, water levels have decreasing in Koshi River. Water flow in the river was measured at 235,510 cusec on Wednesday evening. 





Monsoon wreaks havoc: Flood, landslide death toll rises

Tuesday, July 26, 2016

Jul 27, 2016- Nepali mobile telecom subscribers will be able to enjoy faster and higher-quality data services once the planned 4G technology is rolled out, telecom service providers have said.
Customers will be able to use services such as high definition video download/upload, high-definition mobile TV, video conferencing, 3D television and gaming, among others, they said.
State-owned Nepal Telecom and private company Ncell have applied for the launch of the 4G service from the existing 1800Mhz frequency band.
NT said it plans to roll out the service within three months from the Katmandu Valley and Pokhara. “Once the 4G service comes into operation, our customers can enjoy internet speeds of up to 300Mbps,” said Dilli Ram Adhikari, deputy spokesperson for NT. “The speed can be increased further in the future. It will revolutionise the way Nepali use mobile internet.”
Ncell representatives could not be reached for comment.
However, all the handheld devices currently available in the market may not be 4G-compatible. But dealers say a majority of the smartphones launched lately can run 4G services.
Summit Pradhananga, marketing manager at Huawei Technologies Nepal, said most of the smartphones launched after 2015 are 4G network-based. “Smartphones under Huawei’s G, P and M series are 4G-compatible,” said Pradhananga. “More than 70 percent of our smartphones run 4G.”
Manish Rajbhandari, managing director of Allied Trade Link, authorised distributor of Panasonic and Karbonn, said the smartphone market is already prepared for the introduction of the 4G service. “Smartphones are manufactured considering the global market and 4G technology is not a new thing,” he said. “Around 30 percent of our smartphones are 4G compatible.”
Meanwhile, a highly-placed source at Nepal Telecommunications Authority (NTA) said it plans to ask both the mobile service operators to present their action plans to roll out the 4G service. “Once they present their plans, we will give them the permission,” said the NTA source. “It will probably take a week or two to give them the permission.”
The authority is allowing the service providers to upgrade their service based on the “Technology Neutrality Policy”. Under the policy, operators can start 4G service using existing 1800Mhz frequency band.
Currently, both the service providers are offering 2G service using this bandwidth, while 3G service is being provided through 2100MHz band.
NT said it has already prepared the action plan and that it will submit it to the authority as soon as the latter asks for the same. “Once we get the permission, we have to purchase some equipment of radio network and make some upgradation in the software,” said Adhikari, adding NT will be able to launch the service in three months after importing the equipment.
NT plans to initially launch the service in Kathmandu and Pokhara targeting high-end customers, and gradually expand to other major cities. “By the end of this fiscal year, we will launch the service in cities like Biratnagar, Birgunj and Bhar-atpur as the data usage is really high in these cities,” said Adhikari.

Brace yourself: 4G coming soon

Jul 27, 2016- At least 39 people have been killed and 28 have gone missing in the past 24 hours in floods and landslides triggered by incessant rainfall across the country.
Scores of houses and some bridges have been swept away in several parts of the country. Thousands of people have been displaced and hundreds of houses have been waterlogged after floodwaters gushed into their settlements.
Pyuthan, Gulmi, Palpa, Makawanpur, Arghakhanchi, Rupandehi, Banke, Kapilvastu, Udayapur, Morang, Saptari and Jhapa among other districts bore the maximum brunt water-induced disasters as the country continues to experience the most active phase of monsoon.
In Pyuthan, at least 11 people were killed and 23 others have gone missing in separate incidents of flood and landslide. At least 14 people went missing in a single incident of landslide. Landslides triggered by heavy rains buried three houses at Rajawara and Khawang in the district, killing four persons. One person was buried to death in another incident of landslide in Lung, said police. According to Pyuthan District Police Office, five bodies were recovered from the banks of Jhimruk River in Pyuthan Municipality. One person was swept away by a swelling Kodar stream in Majhkot.
In Gulmi, separate incidents of landslide have claimed at least seven lives, while five houses and three bridges have been washed away, said police. More than 70 families have been displaced. Three persons died when a landslide buried a house belonging to Bhim Bahadur Darji a Hastichaur-1. One of his neighbours sustained injuries while trying to rescues the victim.
According to Gulmi
District Police Office, four persons were killed in two separate incidents of landslide at Bishukharka-9 and Hwangdi-3 in the district. A flooded Badighat stream washed away five houses in Chorkate Bazaar.
Landslides wreaked havoc in Palpa district as well with four persons reported dead at Dobhan and Gothadi. A landslide buried a house in Gothadi, killing three persons on Monday night.
Our correspondent from Rupandehi said two persons died while 15 houses were swept away due to the floods in the Tinau and Kanchan rivers in the district. A swollen Tinau river destroyed a suspension bridge at Butwal-13. Around 6,000 people are at risk.
In Makawanpur, three persons were buried to death in a landslide at Bhimphedi-5. The deceased were earthquake victims who were living in a quake-damaged house after repair, said police.
Similarly, four persons were buried to death in separate incidents of house collapse in Baglung while two persons were swept away in Udayapur. One each died in Arghakhanchi, Gorkha, Dolakha, Bara, and Morang districts.
In Jhapa, over 400 flood victims are taking shelter at Bhadrapur Secondary School and 200 victims of Kechana are taking refuge at Mahendra Ratna Lower Secondary School after a flood in the Mechi river swept away their houses.
Around 2,000 villagers of Bhadrapur, Prithvinagar, Kechana, Pathamari and Kumarkhed have been displaced by the floods, according to District Natural Disaster Rescue Committee (DNDRC).
Flooded Mechi river has swept away an embankment on the Indian side. After the incident, Naksalbari, Panitanki and other Indian markets have been waterlogged, said police.
In Saptari, 300 families are living precariously in Gobargadha after sudden rise in the water levels of Koshi river. Around 1,200 people have been disconnected with the district headquarters.
Hundreds of houses inundated
Hundreds of houses have been inundated in Kapilvastu, Parsa, Banke, Bardiya, Dang, Saptari, Morang and Jhapa among other districts. Around 800 houses were waterlogged Kapilvastu after the Banganga river burst its banks.
In Bardiya, flooded Babai river has inundated more than 300 houses in Babai Municipality while hundreds of houses have been waterlogged in Deukhuri of Dang district. In Sunsari, around 200 houses have been deluged.
Water levels rising in Saptakoshi, Narayani
Water flow in the Saptakoshi River has crossed this year’s highest mark after continuous rainfall for the past 10 days. Water flow in the river was measured at 277,410 cusec on Tuesday morning, the highest for this year. Thirty-seven of the 56 floodgates have been opened. Sub-Inspector Bhim Raj Thebe informed that the water levels have been continuously on the rise in the river.
Likewise, water levels at Narayani river too have crossed the danger mark. Local administration has mobilised security personnel to warn people living near the river.


At least 39 dead in floods, landslides across country

Sunday, July 24, 2016

Jul 24, 2016- Floods triggered by heavy rains inundated hundreds of houses in eastern Tarai in the past 24 hours. A boy drowned while another went missing in Sunsari.
In Saptari, about 2,500 houses were inundated in two dozen VDCs owing to the floods. More than 800 houses were waterlogged at Tilathi VDC as the Khando river flooded the settlements. Security personnel rescued Ghuran Sada who was swept away.
The local administration said that floodwater entered into 100 houses in Topa VDC, while 50 houses were inundated in the adjacent Kajauli village.
In Rajbiraj, the district headquarters of Saptari, around 100 houses were waterlogged after the incessant rains. Water levels in several rivers, including Saptakoshi, have reached worrying levels, according to locals.
In Jhapa, the flooded Ratuwa river breached its embankment at Lakhanpur-2 and inundated dozens of houses in settlements on the riverbanks. Deputy Superintendent of Police Hari Prasad Sharma said the security personnel of Nepal Police and Armed Police Force have been working tirelessly to repair the breached embankment. There were also reports of widespread inundation in Bhadrapur, Panchgachhi, Damak, Birtamod, Garamani, Korabari, among other places in the district. Triggered by incessant rains, the water levels in Kankai, Kamala, Ratuwa, Biring, Titing, among other rivers and rivulets, have increased dramatically, said police.
In Sunsari, five-year-old Jisan Ansari of Jalpapur-7 drowned and Salin Miya of Narsingh went missing in a local stream. The victims drowned while fishing in the paddy field. The local administration said about a dozen VDCs were affected by floods in the district.
In Morang, more than 500 houses were inundated at Hasandaha VDC ward No 3 and 5 as the Bakraha stream overflew its banks. Police said the stream burst the embankment at Jayanagar and submerged the nearby settlement. Local Kedar Thapa said the stream breached about 150 metres of the embankment.
Scores of houses were waterlogged at Amardaha, Gobindapur, Dainiya, Sijuwa and Madhumalla. The local administration said a huge number of security personnel have been deployed in the affected area for rescue and relief operations. Paddy planted in hectares of land was destroyed in the disaster.
Alarming rise of water levels in Saptakoshi
SAPTARI: Water levels in Saptakoshi Rive is continuously rising, sparking concerns of flooding among people in the nearby settlements. The flood control office at Koshi barrage reported 242,725 cusecs of flow in the river on Saturday evening and said that 33 floodgates at the barrage have been opened.
All 36 floodgates at Gandak Canal lifted
NAWALPARASI: All 36 floodgates at Gandak Barrage were opened on Sunday as the water levels in Narayani River continued to rise due to incessant rains. The water flow in the river was measured at 334,000 cusecs on Saturday afternoon, up from 272,000 cusecs the previous day. Panic of floods has gripped people living along the riverbanks after the river eroded spurs at Narsahi and Paklihawa.


Hundreds of houses inundated in the East